Photo Gallery
Description
2000 Manitowoc 2250 III Crawler Crane Additional Specifications: • Capacity: 300 ton • Engine Re-Power Installed • New Swing Hyd Motors • Main Hyd Pump • Auxillary Hyd Pump manufacturer in 2013 • Installed New Tracks , Idlers, Pins and Rollers 2014 • Installed New Swing Motors 2 each & Machine • Line Bored the Frame to fit New Swing Motors by manufacture in 2018 • Aux & Main Drum R&R New Planetary Gears • New Bearings, Seals and New Drum Brakes by manufacture in 2018 • Hydraulic Couplers from Upper to Lower unit replaced 2021 • Cold weather package installed • Automatic greaser installed • Series 1, 2 & 3 counterweights • Maximizer 225 package installed • Luffer winch installed • 240 ft. total boom length • Third drum • Hours: 22,919 • 200t 5 sheave block and 15ton auxiliary ball • All original manuals still with the crane • Current Annual Inspection • Location: Washington D.C. For more information, Please call Rick Erzinger Thank you for your Consideration.